VRC engaged a contractor to take down the building on the “Dumaine Parcel” near the East Branch of the Nulhegan River and grade the site. All useable wood and metal were recycled. Tree planting this fall and the natural return of vegetation to the house site will evolve into a riparian buffer between Route 105 and the river shore campsite on this 7-acre parcel. In time natural grasses will be overtaken by shrubs and trees, creating excellent wildlife habitat. A path will lead from a small parking area to the campsite.
Stay in Touch
Subscribe and get the latest on VRC’s initiatives and events.